Articulated Concrete Mat - Div 7
Smallmouth bass caught Upstream of Willow Highway
Division 7 - wetland cut to grade
The purpose of the overflow channel is to create additional floodplain. The overflow channel was installed in Delta Mills Park.
Division 5 - Channel restoration downstream of Inlet Control Structure A.
Division 5 - Area B emergency spillway and Inlet Control Structure B.
Division 5 - Restored channel downstream of Inlet Control Structure A
Division 5 - Inlet Control Structure A
Division 6 - Inlet Control Structure